top of page
Date
Name
Affiliation
Other Observers
Instrument
Hrs Observed
Hrs Lost
Reason
Observing Program
09/12/2025
Ken Watanabe
Florida Gulf Coast University
Jonathan, Xavier
CCD
8
0
No problems to report
Dome closed, lens cap closed, telescope parked. No problems to report. 9/12/25
09/11/2025
XIANMING HAN
Butler University
none
CCD
10
0
No problems to report
active stars
09/07/2025
Tom Rutherford
ETSU
None
CCD
0
10
Other
Though not my night, dust levels were very high all night long which would have prevented opening (I am completing this report for the record).
09/06/2025
Robert Berrington
Ball State University
none
arc
0
10
Clouds
Poor weather--high humidity/rain and clouds--prevented opening for the evening.
09/06/2025
Tom Rutherford
ETSU
None
CCD
6
0
Equipment Failure
M31, binary star. The dome stopped reporting its position at some point, although it still seemed to be moving with the telescope (although at one point, the dome suddenly closed on its own). A recycle failed to bring it back. When I closed up, the dome was reporting that it was at an azimuth of 38 degrees, although my target at 350 degrees azimuth was visible to the scope so I think that is actually where it was pointed. Unable to move it to azimuth 235 so I closed the dome and hid the dome control window as we have been instructed to do.
09/05/2025
Alexandra Yep
Agnes Scott College
Mai Le, Stefan Geier
Andor Camera
2
0.5
Software/Control PC Issues
Mai and I met virtually with Stefan for a training session on the RM telescope. Stefan reported the problem as follows: "After taking Skyflats, the tracking went to idle and didn't start anymore. We tried with cycling the Telescope Computer and also the ACE Control Cabinet. However, when we restart the ACE Node Service on the telescope computer and tried to open the Connector Client again, it doesn't open anymore. I've never had that before (up to now, whenever there was some crash, the Connector Client opened up again, this is the first time that it doesn't start at all anymore)." We did a full restart and then restarted the ACE Node Service on each computer a couple times, and this got everything working again. Then everything worked fine.
09/03/2025
Martha A. Leake
Valdosta State University
none
Andor CCD
12
0
No problems to report
Observed familiar nebula, galaxies and clusters to relearn the ropes. I'm very happy to report that skies were clear and there were no problems. Data is being transferred now.
09/02/2025
Yong Sheng
Clemson University
Dieter Hartmann
Andor CCD griz
10
0
No problems to report
Clemson blazar study. The dome was parked to 235 degrees at the end of the night.
09/01/2025
Tom Rutherford
ETSU
None
CCD
5
0
No problems to report
M31, binary star, variable star. No problems.
08/31/2025
Tom Rutherford
ETSU
None
CCD
3
0
No problems to report
Variable stars. No problems. Used the telescope for the first few hours of the night, then turned it over to Bill Keel for the remainder of the night.
08/31/2025
Tom Rutherford
ETSU
None
CCD
5
0
No problems to report
M31, exoplanet, binary star. No problems. Used the telescope for the first half of the evening, then turned it over to Bill Keel.
08/30/2025
William Keel
University of Alabama
DragonCon Live Astronomy
Andor CCD
6
1
Software/Control PC Issues
Outreach objects. Focus 100053. Two events where CCD hangs during readout. Once it was fixed by cycling ACE control cabinet, second time shortly before morning twilight not so (so I shut down, dome at 235 and dome control hidden).
bottom of page